Jump to content


Photo

Fall 2016 - Greensfelder Trail Build #2

trail build workday greensfelder

  • Please log in to reply
3 replies to this topic

#1 seamonkey

seamonkey

    Site Admin

  • Administrators
  • 604 posts

Posted 03 October 2016 - 07:15 AM

So, we could use your help - this next section is THE section heading to the Overlook. Get past the dirt 'black hole' and into the Ozark Rocky - alt drop line and all. Keep on truckin' and head to the Overlook. No, really, we need you to get there this year!

 

Date: October 22, 2016 - 9am - 1pm

 

RSVP Now

 

Location: Greensfelder County Park

 

What: We will be building new singletrack where we stopped at the last trail build. This next section begins with 1500+ feet of pure dirt work (rogue hoe!!) followed by a drop in to some rocky awesomeness. Gravelly rocks, big rocks, jump rocks, flow rocks, we got some rocks to work with and the main reason the trail heads onto this ridge side.

 

  The singletrack will eventually bring you out to the Scenic Overlook. It would be really great to get to the Scenic Overlook if at all possible. See the map below.  This can only happen if we get 80+ volunteers and several of our rock star trail builders.

 

Where: Greensfelder Park, Allenton Rd. behind Six Flags. NOTE: Park at the Beulah Shelter located about a half mile down Scenic Loop Road - the road inside the park. Lunch will be provided at Beulah Shelter.

 

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

 

Lunch will be provided by St. Louis County. If you would like a vegetarian sandwich, please let us know on our forum under the "Trail Building and Maintenance Announcments" - We usually have a topic for the trail build listed.

 

RSVP Now

 

See who's already registered

 

Beulah_public_map_2016v2.png


Matt Hayes
GORC Board Member
Greensfelder Steward


#2 lirch

lirch

    Advanced Contributor

  • Forum Member
  • PipPipPip
  • 392 posts

Posted 03 October 2016 - 10:25 AM

same day as the BT Epic......... :-(



#3 supradude

supradude

    Advanced Contributor

  • Forum Member
  • PipPipPip
  • 246 posts

Posted 03 October 2016 - 10:47 AM

same day as the BT Epic......... :-(

 

^^^That.


Pizza is life. Beer helps.

#4 seamonkey

seamonkey

    Site Admin

  • Administrators
  • 604 posts

Posted 24 October 2016 - 06:23 PM

We are getting so close. Thank you to the 45+ volunteers who came out and added some serious distance to the ever-growing Beulah loop at Greensfelder. There's a fun descent into a rocky area that features a drop and more.

 

You can ride past where we stopped building if you ride slowly (it's not built yet) by following the pin flags to the overlook. We aren't too far from the end of Phase IV.

 

Beulah_public_map_2016v4.png


  • sniker likes this

Matt Hayes
GORC Board Member
Greensfelder Steward






Also tagged with one or more of these keywords: trail, build, workday, greensfelder

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users