Jump to content


Photo

Rock Hollow Trail Build, Saturday 9/16


  • Please log in to reply
1 reply to this topic

#1 95vtr250

95vtr250

    Advanced Contributor

  • Moderator
  • 966 posts

Posted 12 September 2017 - 06:39 AM

Build - Rock Hollow - Fall '17 Trail Building Day #1

Date: September 16, 2017 - 9am - 1pm

 

Location: Rock Hollow

 

What: We will continue building the trail on the east side of the Paved Rock Hollow trail creating a loop back to the start. The descent to the pavement is rocky and difficult to build in the first half to the switchback, and easier after the switchback. 

 

There is a LOT of trail to build, we hope for a good crowd. You can ride post-lunch at Bluff View or Al Foster to Castlewood, weather-permitting.

 

Where: Rock Hollow and Packwood Park, which will eventually be eight miles of new, multi-use trail in St. Louis County.

 

Meet at Al Foster Trail parking lot, 225 Grand Ave, Glencoe 63038.

 

Directions: Take I-44 west to 109 (first Eureka exit, before Six Flags exit), then go north on 109 to Old State Rd, turn right then right again. Follow road to last parking lot.

 

What to bring: Gloves, Sturdy shoes, eye protection, and something to drink on the trail.

 

There may be a group ride afterwards - weather permitting, so bring your bike if you like.

 

Please RSVP on the GORC website in order to give us an idea on lunch.

 

https://gorctrails.c...?reset=1&id=892

 


Bryan Adams, GORC Board Member
Why should I change my name, he's the one that sucks!


#2 rockbreaker

rockbreaker

    Advanced Contributor

  • Forum Member
  • PipPipPip
  • 933 posts

Posted 12 September 2017 - 08:03 AM

If you are able to ride your bike to the build site. We are only going to allow a few vehicles to drive in. Make sure to bring your boots to work in. 


Glenn
GORC Trail Steward Creve Coeur Park
"St. Louis County's First Park"




0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users