Indian Camp Creek Workday 11-16-19


  • Please log in to reply
1 reply to this topic

#1 G-Tracker

G-Tracker

    Advanced Contributor

  • Forum Member
  • PipPipPip
  • 211 posts

Posted 15 November 2019 - 03:44 AM

The site is showing an error when registering for the event. It is actually registering you after you click so only click once as I've discovered.

 

The workday description says we will be doing mostly maintenance but we went out last week and flagged in 2 reroutes that are about 1/10 mile along the creek bottoms.  The longer of the 2 is absolutely necessary before we lose a part of the existing trail into the creek.

 

If we get the reroutes complete, we may start beautifying this area by removing some honeysuckle and then some maintenance in a few other areas. Weather looks pretty good for November.


Gary
Matson Hill Trail Steward

 

Who climbs up - gets to come down!


#2 J-tracker

J-tracker

    Forum Contributor

  • Forum Member
  • PipPip
  • 45 posts

Posted 16 November 2019 - 03:06 PM

Got the reroutes in the bottoms and also we were able to fix some trouble spots out in the cedars.  Gave the newer reroute by the campsites a freshening up also.  Should be a sweet ride once we get out of freeze thaw conditions.  The tacos for lunch sure hit the spot.  Thanks all for coming out!